Menno DOT Maintenance Shop Remodel

This remodel included the removal and replacement of the overhead doors, walk-thru doors, windows, restroom fixtures, metal roofing and siding, insulation, underground fuel tanks, refueling island, and mechanical system. The remodel also included the removal of concrete for a new service pit, the addition of a crew room and covered entryways at the exterior doors, and expansion of the existing mezzanine.